Re: RhB test train


glenn allen
 

________________________________
On Thu, Nov 22, 2012 at 12:09 AM, Guerbetaler wrote:

Simulation of push-pull trains Chur - St. Moritz - Chur.
Marcus,
 
You describe the rear loco as being the pusher, the front as being a 'braker' how would this be acheived? is the driver operating front the front with the controls only operating the rear loco (no tractive effort on the part of the front loco?)
If I remember previous information the normal formation will have the loco at the front and the driving trailer at the rear when running Chur to St Moritz. These tests would appear to be proving that the formation can operate the other way round if ever required.

[Non-text portions of this message have been removed]

Join main@SwissRail.groups.io to automatically receive all group messages.