Re: Gotthard Base Tunnel open


klaus.kempkens@...
 

Is it really that few ?
Does somebody know in more detail how the signaling in the tunnel works ? How many signaling blocks are available per direction, i.e. what is the length of one block ? How many trains are running in the same direction at any given time ?


Is it correct that the standard speed for intercitys is 200 km/h, and 100 km/h for freight ?


Klaus Kempkens




Re: Gotthard Base Tunnel open

Tue Jun 7, 2016 2:28 pm (PDT) . Posted by:

"Theo" tvanriet mailto:tvanriet@...?subject=Re%3A%20Gotthard%20Base%20Tunnel%20open wrote:
The time difference on the tunnel transit, between an IC-train and a freight train is already between 15-20 minutes.

So the max. they can get through now is 2 IC, one every half hour and two freight trains in between.
Gives 2 IC and 4 Freights, 6 trains in total per hour per direction.

A rather "poor" capacity for such a project.

The only way to put more freights through, would be slowing the IC trains to 160 kmh.

Join main@SwissRail.groups.io to automatically receive all group messages.