On Mon, Feb 10, 2020 at 09:28 AM, Guerbetaler wrote:
No, we are not speaking about the Furka Base Tunnel. We are talking about a tunnel that doesn't exist yet and should replace 2 existing tunnels plus several snow sheds. It's the tunnel from Täsch to zermatt, which should be realised with STEP 35. It will allow to avoid cogwheel between the two places.