Re: Driver killed in BLS collision in Germany


Ewan Tait
 

On Fri, 3 Apr 2020 at 15:17, csipromo via groups.io
<csipromo=yahoo.com@groups.io> wrote:

Apparently the bridge had already been demolished. The accident involved a prefabricated concrete slab that was part of the new bridge that was either being put into place or had very recently been put into place.
Mike,

No, this was the bridge being demolished that collapsed. The deck was
meant to be getting taken out this weekend. The new bridge has been
built several hundred metres to the south.

https://www.badische-zeitung.de/zugunglueck-bei-auggen-mehrere-verletzte-grosseinsatz-laeuft

Regards,
Ewan

--
http://ewan.me.uk