was: RhB : Bernina Gem 4/4 Sat 28th May now Alp Gruem siding


glenn allen
 

From: David
A bit off topic: is that the remains of an old switch on the short siding at Alp Grum?
There doesn’t appear to be room for a track with the retaining wall alongside.
➢ It’s a catch point, routes runaways into the wall rather than letting them run down the hill.

Join main@SwissRail.groups.io to automatically receive all group messages.