Re: How mobile are mobile substations ...
Markus writes:
That is a good point, which I hadn't consider. I guess that this ownership makes it easier (politically, if not technically) to just turn up a convenient point with a mobile
Markus writes:
That is a good point, which I hadn't consider. I guess that this ownership makes it easier (politically, if not technically) to just turn up a convenient point with a mobile
|
By
Chris Wood
·
#22883
·
|
|
Re: How mobile are mobile substations ...
Am 22.06.2015 um 13:50 schrieb Bill Bolton:
The principles may be similar, but the means are different. I'm not aware of mobile substations outside the 16.7 Hz electrifications but would be glad to
Am 22.06.2015 um 13:50 schrieb Bill Bolton:
The principles may be similar, but the means are different. I'm not aware of mobile substations outside the 16.7 Hz electrifications but would be glad to
|
By
OL.Guerbetal
·
#22882
·
|
|
Luzern train diversions in August and September
REPOST WITH CORRECTED DATES
On 15 and 16.08 and 26 and 27.09 Luzern-Zürich Flughafen and return trains will run nonstop from Luzern to Zürich as Rotkreuz to Cham will be closed. They will
REPOST WITH CORRECTED DATES
On 15 and 16.08 and 26 and 27.09 Luzern-Zürich Flughafen and return trains will run nonstop from Luzern to Zürich as Rotkreuz to Cham will be closed. They will
|
By
Martin Baumann
·
#22881
·
|
|
Re: Major disruption in west
Normal service is expected to resume tomorrow. The fire broke out in the basement during building work. It does not appear to have damaged signaling or other vital equipment
Normal service is expected to resume tomorrow. The fire broke out in the basement during building work. It does not appear to have damaged signaling or other vital equipment
|
By
Martin Baumann
·
#22880
·
|
|
Re: Major disruption in west
The fire was in the control centre in Lausanne:
http://www.20min.ch/schweiz/romandie/story/Brand-legt-Bahnhof-Lausanne-lahm-17701128
Time of call to being declared under control was only 18 minutes
The fire was in the control centre in Lausanne:
http://www.20min.ch/schweiz/romandie/story/Brand-legt-Bahnhof-Lausanne-lahm-17701128
Time of call to being declared under control was only 18 minutes
|
By
Martin Baumann
·
#22879
·
|
|
Major disruption in west
"Due to a fire" (It is not stated where but probably connected with signalling) All trains in the area Genève / Lausanne / Biel// Fribourg are subject to delay and cancellation until further
"Due to a fire" (It is not stated where but probably connected with signalling) All trains in the area Genève / Lausanne / Biel// Fribourg are subject to delay and cancellation until further
|
By
Martin Baumann
·
#22878
·
|
|
Re: How mobile are mobile substations ...
I wont quote the whole reply, but what Markus has posted generally
represents the long term operational practice of multiple electric
rail operations around the world, for over a century.
Its just
I wont quote the whole reply, but what Markus has posted generally
represents the long term operational practice of multiple electric
rail operations around the world, for over a century.
Its just
|
By
Bill Bolton
·
#22877
·
|
|
Re: How mobile are mobile substations ...
There are different shades of mobile.
These substations are built specifically so they can fit inside the railway loading gauge and hence be moved by rail.
For some strange reason this is a useful
There are different shades of mobile.
These substations are built specifically so they can fit inside the railway loading gauge and hence be moved by rail.
For some strange reason this is a useful
|
By
Andrew Moglestue
·
#22876
·
|
|
Re: How mobile are mobile substations ...
Am 20.06.2015 um 20:54 schrieb chris_j_wood@... [SwissRail]:
According to Paul Winter, "Schweizer Bahnen unter Fahnen.Die Geschichte des Militär-Eisenbahndienstes" the original idea was to
Am 20.06.2015 um 20:54 schrieb chris_j_wood@... [SwissRail]:
According to Paul Winter, "Schweizer Bahnen unter Fahnen.Die Geschichte des Militär-Eisenbahndienstes" the original idea was to
|
By
OL.Guerbetal
·
#22875
·
|
|
How mobile are mobile substations ...
A recent press report states that the SBB is updating the 18 mobile substations around its network, by replacing the existing control vehicles (converted from passenger coaches) with 40ft containers
A recent press report states that the SBB is updating the 18 mobile substations around its network, by replacing the existing control vehicles (converted from passenger coaches) with 40ft containers
|
By
Chris Wood
·
#22874
·
|
|
Re: Locomotive fire on May 14th in Lausanne
According to what I found, the incident started shortly before midnight and was under control by 2 AM local time. In another incident related to an earlier derailment:
What is of more concern is the
According to what I found, the incident started shortly before midnight and was under control by 2 AM local time. In another incident related to an earlier derailment:
What is of more concern is the
|
By
csipromo
·
#22873
·
|
|
Re: Locomotive fire on May 14th in Lausanne
I have looked at the media reports and it would make a lot of sense that the rescue services were nearby, as it would appear that the loco caught fire on the western approach to Lausanne station,
I have looked at the media reports and it would make a lot of sense that the rescue services were nearby, as it would appear that the loco caught fire on the western approach to Lausanne station,
|
By
gordonwis
·
#22872
·
|
|
Re: Locomotive fire on May 14th in Lausanne
Thanks for the information. Among the information that was available in the media, it stated that the Lausanne fire train was nearby and responded immediately, minimizing the damage.
Regards
Thanks for the information. Among the information that was available in the media, it stated that the Lausanne fire train was nearby and responded immediately, minimizing the damage.
Regards
|
By
csipromo
·
#22871
·
|
|
Re: Locomotive fire on May 14th in Lausanne
11290 only minor damage
By
Martin Baumann
·
#22870
·
|
|
Locomotive fire on May 14th in Lausanne
Does anybody have any information about which locomotive was involved in the fire of May 14, 2015 near Lausanne?
Regards
Mike C
Does anybody have any information about which locomotive was involved in the fire of May 14, 2015 near Lausanne?
Regards
Mike C
|
By
csipromo
·
#22869
·
|
|
Re: Narrow gauge line in Oerlikon
MFO manufactured both normal gauge but also narrow gauges. There would have been some trackage so that they could get narrow gauge material from the factory to wherever it was loaded on normal gauge
MFO manufactured both normal gauge but also narrow gauges. There would have been some trackage so that they could get narrow gauge material from the factory to wherever it was loaded on normal gauge
|
By
csipromo
·
#22868
·
|
|
Ee 3/3 16388
16388 was noted shunting at Zürich HB today. It had a TK in Zürich 13.06.2015.
TK means TECHNISCHE KONTROLLE and has to be undertaken if a loco or other vehicle does not run the required number
16388 was noted shunting at Zürich HB today. It had a TK in Zürich 13.06.2015.
TK means TECHNISCHE KONTROLLE and has to be undertaken if a loco or other vehicle does not run the required number
|
By
Martin Baumann
·
#22867
·
|
|
Re: Narrow gauge line in Oerlikon
The extensive Woolwich Arsenal industrial light railway in the UK was
457mm gauge, and used mechanical power (steam locos).
http://www.irsociety.co.uk/Archives/55/Hector.htm
Cheers,
Bill
Bill
The extensive Woolwich Arsenal industrial light railway in the UK was
457mm gauge, and used mechanical power (steam locos).
http://www.irsociety.co.uk/Archives/55/Hector.htm
Cheers,
Bill
Bill
|
By
Bill Bolton
·
#22866
·
|
|
Re: Narrow gauge line in Oerlikon
On further reflection:
That is very narrow. I cannot find any examples of industrial railways as narrow as 300mm gauge; gauges that small seem only to have been used for miniature railways (park
On further reflection:
That is very narrow. I cannot find any examples of industrial railways as narrow as 300mm gauge; gauges that small seem only to have been used for miniature railways (park
|
By
Chris Wood
·
#22865
·
|
|
Re: Narrow gauge line in Oerlikon
It's not grooved rail but running rail plus a guard rail laid in parallel, presumably to permit the track to be embedded in the road surface.
This road was until about 15 years ago not a public road
It's not grooved rail but running rail plus a guard rail laid in parallel, presumably to permit the track to be embedded in the road surface.
This road was until about 15 years ago not a public road
|
By
Andrew Moglestue
·