Re: Bad crash
As has been said, the sole cause was a driver driving through a red light and into the single track section. Had it been at a different time of day and a track inspection trolley or maintenance train
As has been said, the sole cause was a driver driving through a red light and into the single track section. Had it been at a different time of day and a track inspection trolley or maintenance train
|
By
bs177@...
·
#20103
·
|
|
Re: Bad crash
Yes, but on a railway there can always be a special train or a freight train or something running late or a signal being red for any other reason.
Adherence to the timetable can never be a
Yes, but on a railway there can always be a special train or a freight train or something running late or a signal being red for any other reason.
Adherence to the timetable can never be a
|
By
Andrew Moglestue
·
#20102
·
|
|
Re: Bad crash
Am 30.07.2013 16:43, schrieb bs177@...:
Unfortunately it is 24-year old driver in the NPZ who perished and not the 54-year old driver of the Domino who accelerated against a red signal.
Am 30.07.2013 16:43, schrieb bs177@...:
Unfortunately it is 24-year old driver in the NPZ who perished and not the 54-year old driver of the Domino who accelerated against a red signal.
|
By
OL.Guerbetal
·
#20099
·
|
|
Re: Bad crash
From: "bs177@ggbooks.
Hi Bruce,
I'm not sure why you are not following my explanation. Timetabling is a factor because, as I said, the two REs are unusual in that they run extra to the normal service
From: "bs177@ggbooks.
Hi Bruce,
I'm not sure why you are not following my explanation. Timetabling is a factor because, as I said, the two REs are unusual in that they run extra to the normal service
|
By
gordonwis
·
#20101
·
|
|
Re: Bad crash
No it isn't. Thoughts with all the victims and may this be the last
Fionnbarr
No it isn't. Thoughts with all the victims and may this be the last
Fionnbarr
|
By
Fionnbarr Kennedy
·
#20098
·
|
|
Re: Bad crash
I am having difficulty in understanding how timetabling could be a factor.
This is of course the view of someone who is not familiar with how the signalling system works at that location, what
I am having difficulty in understanding how timetabling could be a factor.
This is of course the view of someone who is not familiar with how the signalling system works at that location, what
|
By
bs177@...
·
#20097
·
|
|
Re: Bad crash
As I had immediately suspected on seeing the time of this accident, the problem appears to have been caused because one unit was forming one of the commuter extras that are outside the standard
As I had immediately suspected on seeing the time of this accident, the problem appears to have been caused because one unit was forming one of the commuter extras that are outside the standard
|
By
gordonwis
·
#20096
·
|
|
Re: Bad crash
________________________________
From: Markus guerbetaler@...
It isn't a friendly Summer for railways in Europe, is it?
... or in Canada ...
________________________________
From: Markus guerbetaler@...
It isn't a friendly Summer for railways in Europe, is it?
... or in Canada ...
|
By
Andrew Moglestue
·
#20100
·
|
|
Re: Bad crash
Am 29.07.2013 22:15, schrieb martinbaumann112:
It wasn't clear until now, which driver is missing. I'm afraid that the collision was a consequence of a human error of the driver of the Domino train
Am 29.07.2013 22:15, schrieb martinbaumann112:
It wasn't clear until now, which driver is missing. I'm afraid that the collision was a consequence of a human error of the driver of the Domino train
|
By
Guerbetaler
·
#20095
·
|
|
Re: Bad crash
--- In SwissRail@..., "martinbaumann112" <martin98baumann@...> wrote:
One train was an NPZ Domino
560 213
--- In SwissRail@..., "martinbaumann112" <martin98baumann@...> wrote:
One train was an NPZ Domino
560 213
|
By
Martin Baumann
·
#20094
·
|
|
Re: Bad crash
The collision was between trains 4049 and 12976. A Swiss news report 10 minutes ago reported one of the drivers was still trapped in the wreckage. The same report stated there were 30 casualties One
The collision was between trains 4049 and 12976. A Swiss news report 10 minutes ago reported one of the drivers was still trapped in the wreckage. The same report stated there were 30 casualties One
|
By
Martin Baumann
·
#20093
·
|
|
Re: Bad crash
Apologies, I should have confirmed the location for those not familiar with Suisse Romande.
Granges is on the Palézieux - Payerne 'Ligne de la Broye' which is mostly single track
Apologies, I should have confirmed the location for those not familiar with Suisse Romande.
Granges is on the Palézieux - Payerne 'Ligne de la Broye' which is mostly single track
|
By
gordonwis
·
#20092
·
|
|
Re: Bad crash
A more traditional single track incident by the looks of it.
http://www.20minutes.fr/societe/1193831-20130729-accident-ferroviaire-fait-plusieurs-blesses-suisse-romande
Looks like a Domino EMU and
A more traditional single track incident by the looks of it.
http://www.20minutes.fr/societe/1193831-20130729-accident-ferroviaire-fait-plusieurs-blesses-suisse-romande
Looks like a Domino EMU and
|
By
gordonwis
·
#20091
·
|
|
Bad crash
http://news.sky.com/story/1121900/swiss-train-crash-44-passengers-injured
Cheers Keith47424.
http://news.sky.com/story/1121900/swiss-train-crash-44-passengers-injured
Cheers Keith47424.
|
By
Keith <keith47424@...>
·
#20089
·
|
|
Another collision
Another accident today http://www.24heures.ch/
Mark
http://www.mark5812.smugmug.com
Another accident today http://www.24heures.ch/
Mark
http://www.mark5812.smugmug.com
|
By
M BARBER
·
#20090
·
|
|
Romanshorn avoiding line (Verbindungslinie)
Normally only used by diverted passenger trains on an iregular basis this line can be done when VHMthB are running their "Uferdampffahrten" Romanshorn-Rorschach and return. The trains use bay platform
Normally only used by diverted passenger trains on an iregular basis this line can be done when VHMthB are running their "Uferdampffahrten" Romanshorn-Rorschach and return. The trains use bay platform
|
By
Martin Baumann
·
#20088
·
|
|
Re: Loetschberg Base Tunnel Major Disruption.
Am 27.07.2013 19:13, schrieb stephen:
According to sbb.ch the disruption, due to a "catenary defect", will last till the end of the day.
Extra trains Spiez�Brig are necessary, because IC2000
Am 27.07.2013 19:13, schrieb stephen:
According to sbb.ch the disruption, due to a "catenary defect", will last till the end of the day.
Extra trains Spiez�Brig are necessary, because IC2000
|
By
OL.Guerbetal
·
#20087
·
|
|
Loetschberg Base Tunnel Major Disruption.
There is major disruption in the base tunnel after a tarpaulin on a freight train got wrapped in the catenary.
This seems similar to the incident which caused the fire in the Simplon tunnel.
IC1072
There is major disruption in the base tunnel after a tarpaulin on a freight train got wrapped in the catenary.
This seems similar to the incident which caused the fire in the Simplon tunnel.
IC1072
|
By
stephenhorobin
·
#20086
·
|
|
Solothurn NBS branch available loco hauled
Biel to Konstanz Trains (IN THIS DIRECTION ONLY) are being diverted via Wnazwill and the NBS (Neubaustrecke) today and tomorrow
Biel to Konstanz Trains (IN THIS DIRECTION ONLY) are being diverted via Wnazwill and the NBS (Neubaustrecke) today and tomorrow
|
By
Martin Baumann
·
#20085
·
|
|
Swiss Crocodile Hunt in early November
For anyone with an interest in Swiss crocodiles and historic center cab electrics, both on the standard gauge and narrow gauge, there will be a bit of a "bonanza tour" with a unique itinerary in early
For anyone with an interest in Swiss crocodiles and historic center cab electrics, both on the standard gauge and narrow gauge, there will be a bit of a "bonanza tour" with a unique itinerary in early
|
By
Andrew Thompson
·
#20084
·
|