Waldenburgerbahn


Martin Baumann
 

The actual regauging work will be 2021-2022 with the metre gauge due to open 10.12.2022

The last day of 750mm trains will be 05.04.2021


Guerbetaler
 

Am 28.01.2020 um 15:02 schrieb Toma Bacic:
Regauging to 1000 mm?
Yes. And all the renewal work "collected" over the previous years.

Markus, G├╝rbetal


Toma Bacic
 

Regauging to 1000 mm?

regards
toma


Martin Baumann
 

All trains replaced by buses 28.06.2020-09.08.2020 inclusive due to engineering work

(https://www.blt.ch/unternehmen/news/neubau-wb.html)


Martin Baumann
 

The Waldenburgerbahn have published a (German) pdf at https://www.blt.ch/fileadmin/user_upload/PDF_Content/WB/Linie_19_Ausgabe_1_2018.pdf

detailing the forthcoming gauge change works and other alterations.

The two main points are no trains between Waldenburg and Bubendorf 07.07.2018 to 30.07.2018 inclusive (bus replacement)

A building will be built to display G 3/3 5 and (if the artist impression is accurate) a coach and a van at Thalhaus.

The steam train will run one last time for photographers on 23.09.2018. This train will NOT carry passengers