According to BAHNFORUM trains worked by 501 units are now permitted to run at 230 km/h in the Ceneri Tunnel and the Gotthard Base Tunnel will be authorised soon. This is the fastest passenger speed in Switzerland, the previous limit being 200 on the NBS and in the Gotthard Base Tunnel and Lötschberg Base Tunnel.


csipromo
 

What are the currently permitted speeds for trains worked by RABDe 500 and RABe 503 (ETR610)?
Is the 230 km/h only in the tunnel or on the entire section between Bellizona and the end of the ETCS before Lugano?

Regards

Mike C


Martin Baumann
 

500 502 503 are all currently 200 maximum. The Bahnforum report was not clear but I think the 230 is just in the tunnel itself.


csipromo
 

Thanks

MC


Clive Dean
 

I find it surprising that such a train, having stopped in Bellinzona, could actually reach that speed before having to slow down for the normal line speed on the remaining historic line into Lugano.


George Raymond
 

According to BAHNFORUM trains worked by 501 units are now permitted to run at 230 km/h in the Ceneri Tunnel and the Gotthard Base Tunnel will be authorised soon. This is the fastest passenger speed in Switzerland, the previous limit being 200 on the NBS and in the Gotthard Base Tunnel and Lötschberg Base Tunnel.
Does this affect the number of freight paths?

George


--
Diese E-Mail wurde von AVG auf Viren geprüft.
http://www.avg.com


gordonwis
 

Clive Dean wrote:
I find it surprising that such a train, having stopped in Bellinzona, could actually reach that speed before having to slow down for the normal line speed on the remaining historic line into Lugano.

As soon as a train has passed through Giubiasco, there is plenty of time for a train to accelerate to 230 into the Ceneri IMO


Guerbetaler
 

Am 20.03.2021 um 21:54 schrieb Martin Baumann:
trains worked by 501 units are now permitted to run at 230 km/h in the Ceneri Tunnel and the Gotthard Base Tunnel will be authorised soon
Today in 501 018: